Finally got everything about 99% wrapped up. Everything is bled, tightened, has cotter pins in it, and I always go a little overboard with loctite. Had to take the tie rods to the machine shop and shorten them a little. Easy to do but a pain in the ass that I had to do it in the first place. They were 2.75"(for +1.5 +1 arms) longer than stock so I took .250 off each side to make them 2.25 longer than stock. Got the toe and camber set. Threw a set of stock shocks on there for the moment while I send mine off to works to have them rebuilt, revalved and resprung. The only thing I cant find is my silencer. I'll have to clean up my garage and do a thorough search. Tonight I just stuck a silencer from my room mates cr250 on there and did the first heat cycle. Started first kick. Man I've missed the sound of a 2 stroke and the smell of klotz.
Last things to do are get a chain breaker and fit my chain, and find that damn silencer.
Last things to do are get a chain breaker and fit my chain, and find that damn silencer.