The nerfs aren't hard. All you do is cut the foot pegs off the mounting bracket and weld on round bar. The nerfs just slide right on. The fronts are held on with U brackets. Takes 20 min max. I know you need an extended swing-arm, but the front I think you need at least +1 & +1 a-arms. Not positive tho :}